Paducah Blueprint and Supply Inc.

  • Login
  • New Account
270.444.6171
  • Login
  • New Account
CURRENT PROJECTS X-Chester High School Tuckpointing and Window Replacement – Phase 2
Bid Date: 12/17/2025
X-Crab Orchard School Renovation
Bid Date: 12/11/2025
X-BASEBALL FIELD: DUGOUT & FACILITY UPGRADES & REPAIRS PHASE 1 SHAWNEE COMMUNITY COLLEGE
Bid Date: 12/05/2025
X-NEW ARENA: FURNITURE, FIXTURES, AND EQUIPMENT MURPHYSBORO COMMUNITY UNIT SCHOOL DIST. 186
Bid Date: 11/17/2025
X-Mt. Vernon High School Track Resurfacing
Bid Date: 11/13/2025
Flora High School-Roof Replacement - Phase 4
Bid Date: 02/03/2026
Akin Grade School Addition
Bid Date: 01/22/2026
NCOE District Renovations Phase 2
Bid Date: 01/20/2026
MCPL at CALVERT CITY – MESSAGE BOARD
Bid Date: 01/20/2026
CORRIDOR RENOVATION ANNA-JONESBORO COMMUNITY HIGH SCHOOL
Bid Date: 01/16/2026
Century HVAC Phase 3
Bid Date: 01/15/2026
Please login to view private projects!

Century HVAC Phase 3


View Project Details View Bidders Login to access more information
ProductSheetDescriptionViewSizeIssue Type
Specifications 000 SpecTOC Ad for bid 8.5x11minSpecifications
Cover_Index 001Cover Sheet24x36Bid Set
002Drawing Index24x36Bid Set
Addendum1 000AAddendum 18.5x11minAddendum
Addendum2 000A Addendum 2Addendum 28.5x11x10Addendum
Job Name Century HVAC Phase 3
Date Added 12/22/2025 5:18:00 PM
Date Updated 12/22/2025 5:20:00 PM
AEC Baysinger Architects JM
AEC Contact Jake McCann
AEC Phone 618-993-8250
AEC email jake@baysingerarchitects.com
View spec book index
View notice to bid
Job Description

Abatement Work covered under Base Bid shall be the complete removal of existing ACM plaster ceilings and all associated items attached to the ceilings throughout the locker rooms, shower rooms, and coaches’ offices.

General Work covered under Base Bid shall include the demolition of existing 2x4 ACT ceiling, lighting fixtures, cutting of new roof penetrations for new rooftop units and ductwork, and removing unit ventilators in the areas shown in the Construction Documents.

New work includes the installation of a new 2x2 ACT ceilings, LED light fixtures, structural steel reinforcing, roof curbs and rooftop units, roof patching, roof mounted condensing units, new gypsum ceiling in locker room areas, new gas piping, glazing replacement, floor patching, and interior and exterior painting. Corresponding Mechanical, Electrical, and Plumbing Systems will also be included. General Work covered under Alternate Bid #1 shall be all work associated with the elementary gymnasium which include, but is not limited to, the completed replacement of the existing ground mounted mechanical units, ductwork, and lighting.

Job Purchase Information

999 Broadway Paducah, KY 42001 Phone: 270-444-6171, web@padblue.com

PLAN DEPOSIT: For Electronic Copies: One deposit for each set of documents shall be made payable to Paducah Blueprints in the amount of Fifty Dollars ($50.00) which is non-refundable.

AND/OR

Hard Copies: Two deposits for each set of documents shall be made payable to Paducah Blueprints in separate amounts of one hundred Dollars ($100.00) which is non-refundable and two hundred Dollars ($200.00) which will be refunded upon return of documents in good condition to Paducah Blueprints within 30 days after Bid opening.

Memo Notes

PRE-BID MEETING TIME AND LOCATION:

January 6, 2026 / 10:00 a.m. Century High School 4819 Shawnee College Road Ullin, Illinois 62992

BID SUBMISSION DEADLINE AND BID OPENING LOCATION:

January 15, 2026 / 2:00 p.m. Baysinger Architects 401 North Market Street Marion, IL 62959

Pre Bid Date 01/06/2026
Pre Bid Time 10:00
Bid Date 01/15/2026
Bid Time 14:00
 