Job Name |
Century School HVAC Replacement – Phase 2 |
Job Description |
PROJECT DESCRIPTION: Work to covered by Base Bid shall include the demolition of existing 2x4 ACT ceiling, lighting fixtures, cutting of new masonry wall penetrations for new ductwork, hydronic piping, and ceiling mounted mechanical system in the areas shown in the Construction Documents. New work includes the installation of a new 2x2 ACT ceilings, LED light fixtures, ground mounted DOAS unit, VRF ceiling mounted units, new gypsum soffit, new gas piping, and interior and exterior painting. Corresponding Mechanical, Electrical, and Plumbing Systems will also be included. |
Job Purchase Information |
OBTAIN PLANS FROM: Paducah Blueprint & Supply 999 Broadway Paducah, KY 42001 Phone: 270-444-6171, Email: web@padblue.com
PLAN DEPOSIT:
For Electronic Copies: One deposit for each set of documents shall be made payable to Paducah Blueprints in the amount of Fifty Dollars ($50.00) which is non-refundable.
For Hard Copies: Two deposits for each set of documents shall be made payable to Paducah Blueprints in separate amounts of one hundred Dollars ($100.00) which is non-refundable and two hundred Dollars ($200.00) which will be refunded upon return of documents in good condition to Paducah Blueprints within 30 days after Bid opening. |
Memo Notes |
PRE-BID MEETING TIME AND LOCATION: January 30, 2025 / 10:00 a.m. Century Elementary School 4721 Shawnee College Road Ullin, Illinois 62992
BID SUBMISSION DEADLINE AND BID OPENING LOCATION: February 13, 2025 / 2:00 p.m. Baysinger Architects 401 North Market Street Marion, IL 62959 |