Paducah Blueprint and Supply Inc.

  • Login
  • New Account
270.444.6171
  • Login
  • New Account
CURRENT PROJECTS Chester High School Tuckpointing and Window Replacement – Phase 2
Bid Date: 12/17/2025
Crab Orchard School Renovation
Bid Date: 12/11/2025
BASEBALL FIELD: DUGOUT & FACILITY UPGRADES & REPAIRS PHASE 1 SHAWNEE COMMUNITY COLLEGE
Bid Date: 12/05/2025
NEW ARENA: FURNITURE, FIXTURES, AND EQUIPMENT MURPHYSBORO COMMUNITY UNIT SCHOOL DIST. 186
Bid Date: 11/17/2025
X-Mt. Vernon High School Track Resurfacing
Bid Date: 11/13/2025
X-BUILDING L: HVAC SYSTEM REPLACEMENT SHAWNEE COMMUNITY COLLEGE
Bid Date: 11/06/2025
X-METROPOLIS RURAL HEALTH NEW CLINIC
Bid Date: 10/21/2025
X-Murphysboro HS Woodshop Dust Collection System Replacement
Bid Date: 10/16/2025
X-MEWS WO #6 Water Well Protection Walls
Bid Date: 10/15/2025
X-Hardin County Driveway Replacement
Bid Date: 10/14/2025
X-Jonesboro Concession Stand
Bid Date: 10/14/2025
X-REVISED BID DATE-Murray Calloway Co Hospital Exterior Cleaning South Tower and Medical Arts Building
Bid Date: 10/09/2025
X-Mayfield Water and Electric UV SYSTEM PROTECTION BUILDING
Bid Date: 09/25/2025
Please login to view private projects!

X-MEWS WO #6 Water Well Protection Walls


View Project Details View Bidders Login to access more information
ProductSheetDescriptionViewSizeIssue Type
Specifications 000 SpecSpecTOC-AdforBid8.5x11minSpecifications
Comprehensive Set Diagram0018.5x11minBid Set
Drawing0028.5x11minBid Set
Job Name X-MEWS WO #6 Water Well Protection Walls
Date Added 9/29/2025 3:58:00 PM
Date Updated 10/17/2025 5:13:00 PM
AEC Codell Construction (CM)
AEC Contact Colton Miller
AEC Phone 859-744-2222
AEC email cmiller@codellconstruction.com
View spec book index
View notice to bid
Job Description

The work for this project is related to Presidential Declaration of Disaster 4630-DR-KY, KY Severe Storms, Straight-Line Winds, Flooring and Tornadoes, dated December 12, 2021. This is an acknowledgement that FEMA Financial Assistance Awards will be used to fund a portion of the Project Contract. All Bidders shall comply with all applicable federal law, regulations, executive orders, FEMA policies, procedures, and directives including, but not limited to those found in the Volume One Project Manual Bidding and Contract Documents.

Job Purchase Information

Drawings, specifications, and the project manual may be obtained by contacting Paducah Blueprint @ (270) 444-6171.

All questions related to the bidding documents should be directed to the Construction Manager As Contractor.

Colton Miller

Codell Construction Company 4475 Rockwell Road Winchester, KY 40391

PHONE: (859) 744-2222 CELL: (859) 644-2401 E-MAIL: CMILLER@CODELLCONSTRUCTION.COM

An electronic copy of the complete set of Drawings, Specifications, and the Project Manual are available at (cost from Printer). If bidder desires hard copy of Drawings and Specifications, bidder will be responsible for paying the printing cost.

Bidder shall confirm cost with printer.

Cost to print is $60.00 If shipping is needed add an extra $15.00

Memo Notes

Bids will be due to Mayfield Electric and Water Systems at 408 EAST BROADWAY, MAYFIELD, KY 42066 by October 15, 2025 @ 11: 00 AM Central Time. Each bid must be accompanied by a 5% Bid Bond. The bid will be submitted in duplicate on copies of the Form of Proposal located in the Volume One Project Manual Bidding and Contract Documents. Both copies of the Form of Proposal and Bid Bond shall be placed in a manila envelope and have the Project Name and Proposed Bid Package number affixed. 

Pre Bid Date
Pre Bid Time
Bid Date 10/15/2025
Bid Time 11:00
 
Zoom: 

Copyright © 2025 Paducah Blueprint and Supply Inc. All Rights Reserved.