ACM wall and ceiling tiles and mastic, 9x9 ACM floor tile and mastic, ACM science casework and countertops, and under floor piping and ACM pipe insulation per IDPH requirements and regulations. General Work to include the complete renovation of the high school office suite and science lab as well as exterior building and wayfinding signage, and interior room signage. Work to include the installation of metal stud and gypsum partitions, CMU infill, concrete floor work, hollow metal door and frames, wood doors, acoustical wall panels, science lab casework, office casework, LVT flooring, vinyl sheet flooring, interior and exterior painting, interior and exterior signage, gypsum and ACT ceiling assemblies, new roof curbs, a roof top unit, two rooftop condensing units, interior ductwork, gas piping, and light fixture. Corresponding Structural, Mechanical, Plumbing, and Electrical Systems will also be included. Alternate Bid #1 Work to include the replacement of three exterior door assemblies and the installation of one new interior door assembly.