Work to include the removal of existing portions of concrete slab on grade, masonry wall, plaster ceilings, light fixtures, and abandoned HVAC ductwork. New work to include the installation of new concrete equipment pad, pipe bollards, carpet tile, luxury vinyl tile, metal stud framed, plastic laminate and gypsum soffits and walls, wall base, casework, plaster infill, masonry wall infill, concrete slab infill, sink, suspended acoustic ceiling panel clouds, light fixtures, mini-split system, and Ductwork modifications.